摘要 为了确定同塔双回输电线路操作过电压最小空气间隙,运用ATP计算了500kV太安-黄坪同塔双回空载线路合闸过电压、单相重合闸过电压、故障解环操作过电压,通过比较获得了相地2%最高过电压为1.82p.u,出现在线路末端距太安22%处。开展了500kV双回线路真型塔中相I串对下侧横担、下相I串对塔腿间隙操作冲击试验,获得了间隙距离与操作波放电特性曲线,结合最高过电压水平计算了中相I串对下侧横担、下相I串对塔腿最小安全间隙为2.75m和2.78m,为500kV同塔双回线路操作过电压间隙选择提供了依据。 In order to determine the minimum air gap of switching overvohage for double-circuit transmission line on same tower, the author calculates closing overvohage on unloaded line, single- phase reelose overvohage, fault interruption overvohage in ATP for Taian-huangpin 500 kV doublecircuit transmission line, the result shows that phase-ground 2% maximum overvoltage is 1.82 p.u and the location is 22% far from the end of taian line. The switching impulse test of gap for middle-phase conductor to lower cross-arm and lower-phase conductor to tower is developed respectively on tower of 500 kV double-circuit transmission line, and the discharge curve of switching impulse is obtained. According to the highest overvoltage computation result, the minimum air gap is 2.75 m for middle- phase conductor to lower cross-arm and 2.78 m for lower-phase conductor to tower, it provides evidence for switching overvoltage gap distance selection of 500 kV double-circuit transmission line.
出处 《电瓷避雷器》 CAS 北大核心 2016年第2期106-110,共5页 Insulators and Surge Arresters
关键词 同塔双回输电线路 操作过电压 最小空气间隙 空载线路合闸过电压 放电特性曲线 double-circuit transmission line on same tower switching overvohage the minimum air gap closing overvoltage on unloaded line discharge curve
  • 相关文献

参考文献12

二级参考文献41

共引文献282

同被引文献23

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部