摘要 针对f>8硬岩工程地质条件,提出了基于炮掘法的设备选型和配置的经验理论。该理论建立了循环进尺与岩性、炮眼深度之间的数学模型,构建了破、装、运等设备的选型和配置方面的数学模型。鲁班山北矿运输大巷的生产实践表明,该理论创造了硬岩巷道最高月进尺433 m、平均月进尺400 m、平均工效4.17 m/(月·人)的技术水平。 According to engineering geological conditions of hard rock f〉8, experience theories of equipment selection and configuration are proposed based on blasting method. Mathematical models among cyclic-footage, rock types and borehole depth, mathematical models about selection and configuration of equipment for breaking, loading, transportation processes, are established in the theories. The practice in +475 in level main transportation roadway of Lubanshanbei mine shows that the theories created the new levels which have the highest monthly footage 433 m, average monthly footage 400m, and an average efficiency 4.17 m/(month.person).
出处 《煤矿机械》 2016年第4期124-126,共3页 Coal Mine Machinery
基金 四川省教育厅一般项目(14ZB0030) 四川省安监局安全生产科技攻关项目(scaqjgjc_stp_20150011) 四川师范大学"251重点人才培养工程"项目 四川师范大学2013年度校级重点培育课题
关键词 硬岩 巷道 炮掘法 快速掘进 hard rock roadway blasting rapid excavation
  • 相关文献

参考文献7

二级参考文献32

共引文献271

同被引文献23

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部