期刊文献+

西石门铁矿北区斜井保安矿柱圈定优化 被引量:9

Delineation Optimization of Incline Shaft Safety Pillar for North Mining Area of Xishimen Iron
下载PDF
导出
摘要 西石门铁矿北区进入二期开采后,原提升斜井仅作为一条进风井,允许发生较大变形,但不允许塌断。由此降低了保护级别,缩小了保护范围,并且确定保护范围的依据由原来的移动角改为陷落角。同时,在采空区冒透地表后,采取及时向地表塌陷坑内充填废石散体的技术措施,将矿岩陷落角提高至75°以上。在此基础上,由原来的用60°移动角改用75°陷落角重新圈定斜井保安矿柱,从而释放了大量矿柱矿量。这些被释放的矿柱矿量,应用自落顶、设置回收进路的无底柱分段崩落法和平底堑沟底部结构诱导冒落法得以安全回采,取得了良好的技术经济效果。 After entering the second stage mining in north mining area of Xishimen Iron Mine,the left incline shaft only as a downcast,allowing a large deformation,but not allowed to fall off,so the protection level is reduced and reduced the protection scope,meanwhile the basis of determining the scope of protection is changed from moving angle to collapse angle. Filling the collapse pit with waste rock in time can improve the collapse angle,the collapse angle can be increased to 75° when the granular filling depth reaches the critical granular column hight in north mining area. Redelineate the safety pillar with 75°subsidence angle to replace rock moving angle which is 60°,thereby a significant amount of pillar ore is released. The released pillar ore have been mining with no pillar sublevel caving mining method or inducd failing with trench bottom structure mining method,and have achieved marked technical and economic results.
出处 《金属矿山》 CAS 北大核心 2016年第4期13-15,共3页 Metal Mine
基金 中央高校基本科研业务费专项(编号:N130301002)
关键词 散体柱支撑 岩移控制 矿柱圈定 陷落角提高 Granular column support Rock movement control Delineation of satety pillar The improvement of subsidence angle
  • 相关文献

参考文献5

二级参考文献21

  • 1姜建军,刘建伟.大冶铁矿矿山环境调研报告[J].国土资源通讯,2005(15):42-43. 被引量:10
  • 2武钢矿业公司大冶铁矿龙洞采区塌陷区预测及尾矿管防护措施研究[R].武汉:中国科学院武汉岩土力学研究所,武钢矿业公司大冶铁矿.2008,6.
  • 3Zhou Chunmei,Wu Yanling, Li Xianfu, et al. Slope Hazards and System Design of Emergency Rescue in Daye Iron Mine[C]//Qiyuan Pebg, Yun Pu, Kelvin C P Wang, et al. International Conference on Transportation Engineering 2009 (Volume Five). The American Society of Civil Engineers, 2009:4098 - 4103.
  • 4大冶铁矿深部探矿关键技术研究与应用[R].武汉:中国冶勘总局中南地质勘查院,2006,12.
  • 5Lupo J F. Progressive failure of hanging wall and footwallKiirunavaara mine, Sweden[ J ] International Journal of Rock Mechanical Mine Sciences, 1997,34 (3/4 ) : 684.
  • 6杨重工.浅谈岩移理论及其应用[J].有色金属:矿山部分,1983(6):36-40.
  • 7黄文钿.岩层移动研究[J].有色金属:矿山部分,1981(4):21-23.
  • 8Cui X M, Miao X X, Wang J A, et al. Improved prediction of differential subsidence caused by underground mining [ J ]. Rock Mechanical Mine Science, 2000,37 (4) : 615 - 627.
  • 9Tao G Q, Ren F Y, Huang Z Y. Measures of controlling underground mined out areas [ C]//Proceedings of the 2004 International Symposium on Safety Science and Technology. Beijing, 2004:679 683.
  • 10Barry H G, Brown E T. Rock mechanics for underground mining[M]. Netherlands:Springer, 2006:484 517.

共引文献46

同被引文献86

引证文献9

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部