摘要
重点分析了110kV库西变电站110kV电流互感器配置、二次电压切换、断路器位置等方面的问题,并提出了相应的解决方案。
This paper focuses on the analysis of the following issues, including the configuration of 110kV current transformer,voltage switch of secondary side, breaker position and other aspects of the 110kV Kuxi substation, and corresponding solutions are put forward.
出处
《山西电力》
2016年第2期46-49,共4页
Shanxi Electric Power
关键词
3/2接线
电流互感器位置
电压切换
断路器跳闸位置
改造TWJ
3/2 line connection
the position of current transformer
voltage switching
circuit breaker tripping position
modification of TWJ