摘要
结合长春地铁1号线工程的场地环境及施工难点,介绍了该地铁地下连续墙的施工流程与技术要点,总结了地下连续墙导墙施工的关键步骤,为同类工程施工积累了经验。
Combining with the site environment and construction difficulties of No. 1 line project of subways in Changchun,the paper introduces the construction procedures and technical points for the subway underground continuous walls,and sums up the key steps for the construction of the guide wall of the underground continuous walls,so as to accumulate experience for similar construction.
出处
《山西建筑》
2016年第11期68-70,共3页
Shanxi Architecture
关键词
地铁
地下连续墙
导墙
钢筋笼
subway
underground continuous wall
guide wall
reinforced cage