摘要
结合工程实例,介绍了现浇箱梁碗扣式满堂支架施工设计需考虑的因素,从支架设计形式、支架受力、模板及方木受力等方面,探讨了满堂支架设计参数的计算方法,并总结了满堂支架的预压技术,有利于保证工程的施工质量。
Combining with the engineering example,this paper introduced the factors to consider in cast-in-place box girder bowl-type full framing construction design,from the framing design form,support force,template and wood stress and other aspects,discussed the calculation method of full framing design parameters,and summarized the pre-loading technology of full framing,to ensure the construction quality of engineering.
出处
《山西建筑》
2016年第11期174-175,共2页
Shanxi Architecture
关键词
现浇箱梁
满堂支架
荷载
模板
cast-in-situ box girder
full framing
load
template