10kV供电线路改造——以黑龙江省八面通林业局保障性安居工程供电线路改造建设工程为例

Power Supply Line Reconstruction——Taking Power Supply Line Reconstruction Of Supportability Engineering Comfortable Housing Project In Tongda Forest Bureau Of Bamianpo In Heilongjiang Province As An Example.
下载PDF
导出
摘要 随着林业局局址改造需对城网干线进行改造,由于穆棱市供电采用主干线采用手拉手式供电,可以满足N-1原则,因此本次改造内容为取消八面通林业局局址内不必要的网络分支,解决交叉供电及供电半径过大的问题。根据新的总体规划布局,使林业局局址形成了一个由主干线为配电线路的统一坚强而又各自相对独立的配电网架。 With the transformation of the Forestry Bureau address need to transform the city trunk line, due to the Muling City power supply using the main line of hand and hand type power supply, can satisfy the N - 1 principle, therefore the transformation content for the BamiantongForestry Bureau address cancel the unnecessary branch network to solve the problem of cross power supply and power supply radius is too large. According to the new master plan layout, the Forestry Bureau address has formed a unified strong and relatively independent distribution network. , which is the trunk line for distribution lines.
作者 王丽娜
出处 《林业科技情报》 2016年第1期82-83,92,共3页 Forestry Science and Technology Information
关键词 电网 变压器 10kV高压线 plant electricity 10kV high voltage line
  • 相关文献

参考文献7

二级参考文献11

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部