摘要
对曝气沉淀池中心导流管进行改造,重新设计中心导流管长度,确定中心导流管喇叭口尺寸,加装底部反射板,使整个污水处理系统运行更加平稳高效。
The central draft tube sedimentation tanks aeration transform redesigned center draft tube length to determine the center of the draft tube flare size, the installation of the bottom of the reflector plate, the entire sewage treatment system run more smoothly and efficiently
关键词
污水处理站
活性污泥法
沉淀池
sewage treatment station
activated sludge
sedimentation tank