摘要
依托某隧道富水断层破碎带突水突泥地质灾害处治工程,阐述了断层突水突泥过程、水文地质特征、灾变机制、复合控制注浆方案、施工工艺及注浆效果评价等,提出富水断层破碎带突水突泥地质灾害复合控制注浆处治关键技术。
To investigate the geological disasters of water inrush mud caused by water rich fault zone,based on relevant treatment engineering of a tunnel,which processes were elaborated from aspects of process of water and mud in fault,hydrogeological characteristics, disaster mechanism, composite control grouting scheme,construction technology and grouting effect evaluation,etc. Furthermore,key technology of compound control grouting treatment for water rich fault zone with water and inrush mud was pointed out.
出处
《四川建材》
2016年第2期109-111,共3页
Sichuan Building Materials
关键词
富水断层破碎带
隧道
复合控制注浆方法
注浆效果
water-rich fault fractured zone
tunnel
compound control grouting reinforcement
grouting effect