期刊文献+

地下水超采综合治理水利工程措施分析--以馆陶县为例 被引量:11

Research on Water Conservancy Project Measures for Over-exploitation Groundwater Control and Management
下载PDF
导出
摘要 对地下水超采治理中水利工程措施进行了分析,简要介绍了地表水替代地下水、井灌区高效节水中应采取的水利工程措施。地表水替代地下水,是指通过一系列水利工程措施,建立从水源到田间的完善的灌溉体系,充分利用地表水灌溉,减少地下水开采;井灌区高效节水,是指对井灌区,通过发展节水灌溉,提高灌溉水利用系数,减少地下水开采。文中分析了不同工程措施的适用情况,并以河北省馆陶县地表水替代地下水工程为例,介绍了不同水利工程措施在地下水超采治理中的实践应用,为开展地下水超采治理提供参考。 This paper analyzed water conservancy project measures concerning the over-exploitation of groundwater,and briefly introduced some measures that in Surfacewater-replacing-groundwater Project and high-efficient water-saving of well irrigation area.Surfacewater-replacing-groundwater Project,is through a series of measures to build water conservancy project,Set up from the water to the field of perfect irrigation system,Make full use of surface water for irrigation,reduce groundwater exploitation;High-efficient water-saving of well irrigation area,Through the development of water-saving irrigation,improve the utilization coefficient of irrigation water,reduce groundwater exploitation.This paper analyzed the application of different engineering measures,and the Surfacewater-replacing-groundwater Project of Guantao County,Hebei Province as an example to introduce some practical applications for various water conservancy project measures,so as to provide some references for over-exploitation of groundwater management.
出处 《中国农村水利水电》 北大核心 2016年第4期8-10,20,共4页 China Rural Water and Hydropower
基金 国家自然科学基金项目(51309155) 中央分成水资源费资助项目(1261530210034) 中国水利水电科学研究院流域水循环模拟与调控国家重点实验室开放研究基金项目(IWHR-SKL-201515)
关键词 地下水 超采治理 工程措施 groundwater over-exploitation of groundwater water conservancy project measures
  • 相关文献

参考文献11

二级参考文献48

共引文献106

同被引文献111

引证文献11

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部