摘要 为了解决F_(j145)断层对回采的影响,采用地质力学测试分析了地质异常区的应力状态,采用数值软件FLAC^(3D)初步分析了断层的成因、应力演化规律及影响范围。决定采用深孔高压注浆进行处理,注浆压力25 MPa,开发了水泥改性液,水泥浆和煤体黏结强度达到1.2 MPa。通过改进注浆钻孔方式,解决了瓦斯、浆液凝固慢、糊孔、转进速度慢等问题,并采用地质雷达检验了注浆效果。结果表明:通过超前深孔预注浆,断层影响区恢复完整,保证了工作面正常生产。 In order to solve the influence of F_(j145) fault on mining. The ground stress state of geological abnormal zone was analyzed by ground stress test,and the formation reasons of normal fault,stress evolution laws and influence scope were analyzed by software FLAC^(3D),and then the high pressure grouting was used for advanced deep hole reinforcement,the grouting pressure was 25 MPa. Modified cement liquid was developed,and the improved cohesion was 1.2 MPa between cement grouting and coal; the drilling speed and drilling hole paste were solved by improved drilling way. The grouting result was monitored by geological radar,the results show that the broken fault zone was renewed,and the grouting result was good.
作者 李文洲
出处 《煤矿安全》 CAS 北大核心 2016年第4期177-180,共4页 Safety in Coal Mines
基金 天地科技股份有限公司基金资助项目(KJ-2014-TDKC-01)
关键词 高瓦斯 地质异常区 正断层 超前深孔加固 水泥改性液 地质雷达 high gas geological abnormal zone normal fault advanced deep hole reinforcement modified cement liquid geological radar
  • 相关文献

参考文献8

二级参考文献65

共引文献322

同被引文献44

引证文献5

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部