摘要 本文主要分析铁塔基础施工过程中余土的产生、处置现状、余土处置不当造成的影响,综合考虑塔位处地形实际情况,总结了余土处置的几种措施。为了尽量减小弃土产生的各种不利影响,建议在工程设计阶段,应做好基础选型优化,从源头上减少弃土土方量;在终勘定位过程中,相关专业应加强协同配合,合理确定弃土的处置措施;在施工阶段,当需修筑堡坎时,应严格按施工要求进行施工。 This paper focuses on the analysis of influence caused by the improper construction of the tower foundation soil of, treatment status, residual soil disposal,considering the tower located at the actual situation of the landform,soil disposal several measures are summarized.In order to minimize the waste soil produced a variety of adverse effects,it is recommended in the engineering design stage,we should do a good job selection based on the optimization,from the source to reduce dump earthwork;in the final location survey process,relevant professional should strengthen coordination, reasonably determine the spoil disposal measures;in the construction phase,when needed to build Fort Sill should be strictly according to the requirement of the construction construction.
作者 周松
出处 《电子测试》 2016年第3期151-152,共2页 Electronic Test
关键词 铁塔基础 开挖余土 利用 tower foundation excavation residual soil utilization
  • 相关文献

参考文献2

二级参考文献4

共引文献15

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部