谏壁电厂300MW机组改造前后热力性能的对比及分析 被引量:2

COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
下载PDF
导出
摘要 介绍了谏壁电厂对上海汽轮机厂早期生产的 1台 30 0MW机组成功改造的经验。利用改造前后热力试验数据分析了改造效果 ,并且运用等效焓降法对热力系统有关因素进行了定量计算 ,找出了一些具有改造潜力的单元及设备 。 The successful experience of retrofitting a 300MW unit manufactured by Shanghai Steam Turbine Factory in early years and installed at Jianbi Power Plant has been presented. The retrofitting results are analyzed via using the thermodynamic test data before and after the retrofitting, and a quantitative calculation of related factors in the thermal system is carried out via utilizing an equivalent heat-drop method, some parts and equipment's possessing potential to be retrofitted are found, providing with scientific basis for further retrofitting the unit.
作者 戴船龙
机构地区 谏壁发电厂
出处 《热力发电》 CAS 北大核心 2002年第4期2-6,共5页 Thermal Power Generation
  • 相关文献

参考文献6

共引文献8

同被引文献10

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部