410t/h CFB锅炉传热系数试验研究 被引量:1

EXPERIMENTAL INVESTIGATION ON HEAT TRANSFER COEFFICIENT OF CFB BOILER IN GAOBA POWER PLANT
下载PDF
导出
摘要 分析了高坝发电厂 4 10t/h循环流化床 (CFB)锅炉的大量运行和试验数据 ,以及锅炉负荷率、炉膛气速、床压、床温等主要运行参数对炉膛受热面平均传热系数的影响及相互之间的关系 ,得出了一些比较有规律性的结果。这些结果对于CFB锅炉的设计。 A vast amount of operational and experimental data for a 410t/h CFB boiler in Gaoba Power Plant, as well as the influence of its main operational parameters, such as boiler load factor, gas velocity in furnace, bed pressure, and bed temperature etc., upon the average heat transfer coeficient of heating surface in the furnace, and the mutual relationship among the said parameters have been analysed, some results with better regularities are obtained. These results have comparatively high reference value for design, manufacture and operation of CFB boilers
机构地区 国电热工研究院
出处 《热力发电》 CAS 北大核心 2002年第4期34-37,共4页 Thermal Power Generation
  • 相关文献

参考文献4

  • 1张敏,蔡元丰.内江 410 t/h CFB 锅炉技术特点介绍[J].中国电力,1997,30(6):6-9. 被引量:10
  • 2(加)P.巴苏 SA弗雷泽.循环流化床锅炉的设计与运行[M].北京:科学出版社,1994..
  • 3蒋敏华 等.大型循环流化床锅炉技术[M].国家电力公司热工研究院,1998..
  • 4张敏.消化吸收内江电厂100MW CFB锅炉技术的试验研究[M].国家电力公司热工研究院,1998..

共引文献18

同被引文献13

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部