分析和计算了顺德德胜电厂燃气轮机发电机存在的失步问题 ,给出了暂态稳定性计算结果。
The problem concerning fall-out of synchronism on gas-turbine generator set at Desheng Power Plant in Shunde City, Guangdong Puovince, has been analysed and calculated, the calculated result of transient stability being given. The necessity of lossing-step protection for the gas-turbine generator set in Desheng Power Plant and its protection scheme have been expounded and proven.