4Lemaitre M, Verfaillie G. Selecting and scheduling observations for agile satellites: Some lessons from the constraint reasoning community point of view[J]. Principles and Practice of Constraint Programming, 2001: 670-684.
5Mancel C, Lopez P. Complex optimization problems in space systems[C]// 13th International Conference on Automated Planning and Scheduling, Trento, Italy: 2003.
6Vasquez M, Habet D. Saturated and consistent neighborhood for selecting and scheduling photographs of agile earth observing satellites[C]// 5th Metaheuristics International Conference, Kyoto, Japan, 2003.
7Habet D, Vasquez M, Vimont Y. Bounding the optimum for the problem of scheduling the photographs of an agile earth observing satellite[J]. Computational Optimization and Applications[J]. 2010, 47: 307-333.
8Xu M Q, Li Y Q, Wang R X. Scheduling observations of agile satellites with combined genetic algorithm[C]// Third International Conference on Natural Computation, Haikou, China: 2007.
9Anghinolfi D, Boccalatte A, Paolucci M, et al. Performance evaluation of an adaptive ant colony optimization applied to single machine scheduling[J]. Simulated Evolution and Learning, 2008: 411-420.
10Fialho A. Adaptive operator selection for optimization[D]. Orsay, France: Université Paris-Sud XI, 2010.