摘要
结构施工时塔吊设置关系到施工现场道路的布置、材料堆放场地布置、材料加工场地布置、现场临电的布置等各个方面。因此塔吊设置的合理性、安全性、经济性对于做好成片小区住宅及配套建筑的施工组织是非常重要的。
Abstract: The setting of tower crane is related to the road layout in the construction site, material stacking yard layout, material processing site layout, site temporary electrical layout, and other aspects. Therefore, the rationality, security and economy of crane set are very important for a construction organization to do stretches of residential and ancillary buildings better.
出处
《价值工程》
2016年第13期144-146,共3页
Value Engineering