摘要 预想故障集筛选是电力系统可靠性评估的重要组成功能,而现有筛选方法筛选效率较低且容易漏筛一些发生频率较高的高重故障,对系统评估精度造成不利影响。为此本文提出一种概率树贪心故障筛选法(P-tree greedy contingency screening technique,PGCST)以快速准确筛出系统中概率最大的前k个故障。基于概率距离及概率有序树定义,将原始问题转化为求前k个最短路径问题,并针对该问题设计了贪心求解策略。与快速排序法及改进快速排序法相比,PGCST算法复杂度与系统规模无关且算法效率有较大提升,可满足大系统实时在线筛选要求。将所提方法应用于电力系统可靠性评估,在RBTS和RTS79可靠性测试系统下的算例结果表明,基于PGCST的系统评估可达到较高的精度。 Contingency screening is an important part of power system reliability assessment. However, most existing screening methods do not have a high efficiency, and they may omit some high-frequency contingencies with high levels, which will cause an adverse impact on assessment accuracy. Therefore, a novel method, P-tree greedy contingency screening technique(PGCST), was proposed to screen out the first k contingencies with maximum probability accurately and quickly. Based on the definition of probability distance and probability ordered tree, it turned into a problem seeking the first k shortest path. A greedy strategy was designed to figure it out. Compared with fast sorting technique and improving fast sorting technique, the algorithmic complexity of PGCST is independent of system size and it has higher algorithm efficiency. When applied into power system risk assessment, case study in RBTS and RTS79 illustrate that PGCST has high evaluation accuracy.
出处 《中国电机工程学报》 EI CSCD 北大核心 2016年第8期2068-2076,共9页 Proceedings of the CSEE
基金 国家自然科学基金项目(51537010) 国家重点基础研究计划(973计划)资助项目(2013CB228206)~~
关键词 电力系统 故障筛选 可靠性评估 概率距离 概率有序树 贪心法 power system contingency screening reliability assessment probability distance probability ordered tree greedy algorithm
  • 相关文献

参考文献4

二级参考文献74

  • 1宋云亭,周双喜,鲁宗相,张瑞华.基于GA的发输电合成系统最优可靠性计算新方法[J].电网技术,2004,28(15):25-30. 被引量:16
  • 2王韶,周家启.基于函数型连接神经网络的发输电系统可靠性评估研究[J].中国电机工程学报,2004,24(9):142-146. 被引量:15
  • 3宋晓通,谭震宇.改进的重要抽样法在电力系统可靠性评估中的应用[J].电网技术,2005,29(13):56-59. 被引量:50
  • 4CarMen L T Borges.Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environments[J].IEEE Transactions on Power Systems,2001,16(2):203-209.
  • 5Gubbala N,Singh C.Models and considerations for parallel implementation of Monte Carlo simulation methods for power system reliability evaluation[J].IEEE Transactions on Power Systems,1995,10(2):779-787.
  • 6Nader Samaan,Chanan Singh.A new method for composite system annualized reliability indices based on genetic algorithms[C].Power Engineering Society Summer Meeting,IEEE.Chicago,IL USA.2002,2:850-855.
  • 7G.Melo A C,Pereira M V F.Sensitivity analysis of reliability indices with respect to equipment failure and repair rates[J].IEEE Transactions onPowerSystems,1995,10(2):1014-1019.
  • 8Billinton R,Kumar S,Chowdhury N,et al.A reliability test system for educational purposes -basic data[J].IEEE Transactions on Power Systems,1989,4(3):1238-1244.
  • 9A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee.IEEE Reliability Test System[J].IEEE Transactions on Power Apparatus and Systems,PAS-98,1979:2047-2054.
  • 10A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee.The IEEE Reliability Test System-1996[J].IEEE Transactions on Power Systems,1999,14(3):1010-1020.

共引文献251

同被引文献166

引证文献10

二级引证文献100

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部