地下室下扩增层工程常需进行“桩变柱"结构置换,承台节点成为关键部位。为分析节点薄弱区的应力变化状况,首先建立了一桩一柱承台节点的力学分析模型;然后采用有限元方法和单元生死技术,对某高层建筑在不同施工阶段的承台节点应力分布状况进行求解;最后根据求解结果分析薄弱区产生的原因及其应力变化规律。研究结果表明:当承台节点置换为梁柱节点时,核心区应力水平大幅增加;不同施工工序将影响核心区的应力路径。
The 'pile-to-column'structural replacement is usually required in basement extension project and the pile cap joint becomes a key part of the reconstruction.In order to analyze stress variation of weak area of pile cap joint,a mechanical analysis model for one-pile-one-column pile cap joints is established.Then,Finite Element Method and the element birth and death technology are utilized to solve stress distribution of pile cap joint in different construction phases of a high-rise building.Finally,causes of the weak area as well as its stress variation pattern are analyzed according to the solving result.The following conclusions are drawn through this study:stress level of core area increases significantly during the replacement beam-column joints;the stress path in the core area is affected by different construction steps.
出处
《浙江理工大学学报(自然科学版)》
2016年第3期469-473,共5页
Journal of Zhejiang Sci-Tech University(Natural Sciences)
基金
国家自然科学基金项目(41472284)
关键词
节点薄弱区
结构置换
地下室增层
单元生死
weak area of joint
structural replacement
basement extension
element birth and death