期刊文献+

得分信息下考虑不确定心理行为的双边匹配 被引量:4

Two-sided matching considering uncertain psychological behavior with score information
下载PDF
导出
摘要 从不确定心理行为的角度研究得分信息下的双边匹配问题.首先将期望得分视作参照点,计算了得分的相对收益,进而构建了收益矩阵;再根据TODIM理论,将收益矩阵转换为价值矩阵;进一步,构建了匹配模型;通过求解模型得到匹配方案;供需匹配实例说明了所提方法的有效性. This paper investigates the two-sided matching problem with scores from view of uncertain psychological behavior.Firstly,the expectation scores are chosen as the reference points,and the relative gains corresponding to scores are calculated.So,the gain matrixes are built.According to the theory of TODIM,the gain matrixes are converted into the value matrixes.Furthermore,a matching model is developed.The matching alternative is obtained by solving the model.The example for the demander-supplier matching illustrates the good validity of the proposed method.
作者 乐琦
出处 《浙江大学学报(理学版)》 CAS CSCD 北大核心 2016年第2期242-246,共5页 Journal of Zhejiang University(Science Edition)
基金 国家自然科学基金资助项目(71261007 71261006 71462015 71361021 71363022) 江西省自然科学基金资助项目(20151BAB201026) 江西财经大学2014年度校级课题(K06492015)
关键词 双边匹配 得分 不确定心理行为 TODIM two-sided matching score uncertain psychological behavior TODIM
  • 相关文献

参考文献7

二级参考文献138

  • 1陈侠,樊治平.基于不同偏好信息的评价专家水平研究[J].系统工程理论与实践,2007,27(2):27-35. 被引量:16
  • 2聂海峰.高考录取机制的博弈分析[J].经济学(季刊),2007,6(3):899-916. 被引量:49
  • 3Lee J N, Huynh M Q, Chi-wai KR, et al. The evolution of outsourcing research:what is the next issue? [C]. Proceeding of the 33^rd Hawa Ⅱ International Conference on System Sciences, 2000,7 : 7070.
  • 4Ferreira A M D, Laurindo F J B. Outsourcing decision-making aspects considered by IT departments in Brazilian companies [J]. International Journal of Production Economics, 2009,122 (1):305 311.
  • 5Cullen S, Seddon P, Willcocks L. Managing outsourcing: the life cycle imperative [J]. MIS Quarterly Executive, 2005a, 4 (1) :229-246.
  • 6Laciy M C, Khan S A, Willcocks L P. A review of the IT outsourcing literature: insights for practice [ J]. Journal of Strategic Information Systems, 2009,18 (3) : 130 146.
  • 7Lewis I, Talalayevsky A. Third-party logistics: leveraging information technology [J]. Journal of Business Logistics, 2000,21 (2) : 173-185.
  • 8Saouma R. Optimal second-stage outsourcing[J]. Management Science, 2008,54 (9) : 1147-1159.
  • 9Sun SY, Lin T C, Sun P C. The factors influencing Information Systems outsourcing partnership-a study integrating case study and survey research methods [C]. Proceedings of the 35^th Hawa Ⅱ International Conference on Systems Sciences, 2002,8 : 235b.
  • 10ChenL Y, Wang T C. Optimizing partners' choice in IS/IT outsourcing projects: The strategic decision of fuzzy V1KOR[J]. International Journal of Production Economics, 2009, 120 (1); 233 24Z.

共引文献118

同被引文献30

引证文献4

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部