基础设施PPP项目再谈判影响因素及其治理研究 被引量:10

Research on the Influencing Factors and Governance of Renegotiating Infrastructure PPP
原文传递
导出
摘要 PPP模式能够满足公共基础设施需求,有效改善政府大量负债现象、促进管理效率提高,因而成为各国在基础设施方面广泛采用的方法。然而在PPP项目合同执行过程中,不可避免要发生再谈判,影响了PPP合同执行效率。本文分析了PPP项目再谈判的文献,得出如下结论:再谈判现象的影响因素主要划分为不完备合同、机会主义行为以及外部环境变化i再谈判行为既可能导致合作提升项目价值,也可能导致政府或者公众利益受损,进而减少社会剩余;治理再谈判主要是完善合同规制和外部规制,增强基于关系契约的沟通、信任等能促进再谈判向着合作方面发展,提升项目价值。最后,本文提出改善PPP合同绩效的措施。 PPP model has been widely used for providing infrastructure services by many countries in the world because of meeting the needs of the public,decreasing liability of government and improving the efficiency of the government.However,in the process of the implementation of the PPP project contract,renegotiation is inevitable and will affect the efficiency of PPP contract execution.The literatures of renegotiating PPP contract are reviewed and conclusion could be drawn.The main determinants of renegotiation are incomplete contract,opportunistic behavior and external environment change.And renegotiation may increase project value though cooperation,and may cause to damage of government or private interest,thereby reducing social surplus。 The governance measures of renegotiation include improvement of contract regulation and external regulation,and establishment of communication,trust based on relational contract.At last,the suggestions are proposed on how to improve the contract performance of PPP.
作者 娄黎星
出处 《综合运输》 2016年第4期18-24,共7页 China Transportation Review
基金 教育部人文社会科学基金青年资助项目(15YJC630082) 天津市哲学社会科学规划课题项目(TJGL13-033)
关键词 基础设施PPP项目 再谈判 影响因素 治理 infrastructure PPP renegotiation influencing factors governance
  • 相关文献

参考文献22

  • 1Cruz,C.O.,Marques,R.C.Using the economic and financial equilibrium model to decrease infrastructure contract incompleteness[J].Journal of Infrastructure Systems,2013(19):58-66.
  • 2贾康,孙洁,陈新平,程瑜.PPP机制创新:呼唤法治化契约制度建设——泉州刺桐大桥BOT项目调研报告[J].经济研究参考,2014(13):43-61. 被引量:21
  • 3孙慧,孙晓鹏,范志清.PPP项目中再谈判关键影响因素的研究[J].国际经济合作,2010(3):58-61. 被引量:31
  • 4Guasch J.L.Granting and Renegotiation Infrastructure Concessions:Doing it Right[R].World Bank Institute(WBI)Development Studies,Washington,DC.2004.
  • 5陈富良,刘红艳.基础设施特许经营中承诺与再谈判研究综述[J].经济与管理研究,2015,36(1):88-96. 被引量:23
  • 6Cruz,C.O.,Marques,R.C.Exogenous determinants for renegotiating public infrastructure concessions:evidence from Portugal.Journal of construction engineering and management,2013(139):1082-1090.
  • 7Engel,E.,Fischer,R.,Galetovic,R.Soft budgets and renegotiations in Public-Private Partnerships[R],Cowles Foundation discussion paper NO.1723,Yale Univ.,New Haven,CT.August 2009.
  • 8Engel E.,Fischer R.,Galetovic R.Public-Private Partnerships to Revamp U.S.InfrastructurefR].Hamilton Project Report,2011:1-26.
  • 9Cruz,C.O.,Marques,R.C,Cardoso P.Empirical evidence for renegotiation of PPP contracts in the road sector[J].Journal of Legal Affairs&Dispute Resolution in Engineering&Construction^14:1943-4170.
  • 10Cruz,C.O.,Marques,R.C.Endogenous determinants of concession renegotiation:evidence from local infrastructure[J],Local Government Studies,2013,39(3):352-374.

二级参考文献40

共引文献67

同被引文献49

引证文献10

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部