期刊文献+

基于任务可用度的不完全可修系统任务成功性评估模型 被引量:2

Mission success evaluation model of incomplete repairable system based on mission availability
下载PDF
导出
摘要 针对装备结构复杂、系统对备件修复能力有限、系统子任务层次多、复杂任务系统成功性建模难的问题,首先对任务系统下的各层级任务进行定义,根据各层级任务间的逻辑关系,以任务可用度为保障指标,基于METRIC理论建立了不完全修复系统任务成功性模型;然后,分析了优化后的备件方案下系统任务可用度在不同阶段任务的变化,其走势与实际情况基本相符;最后,通过离散事件建模与蒙特卡洛仿真相结合的方法对模型进行了验证,仿真结果与解析结果基本一致。 It is difficult to build the multi-stage mission system modeling due to the complex structure of equipment,limited system repair capability and system-level multi subtasks.The problem can be dealt with as follows:Firstly,tasks at each level of the system are defined,and based on METRIC,the mission availability is regarded as index to build mission success model of incomplete repair system.Secondly,mission availability changes in different stages are analyzed by examples and the trend of curve is consistent with the actual situation.Finally,the result is testified by combining the discrete event modeling with Monte Carlo simulation method.The simulation results are in agreement with the analytical results.
出处 《海军工程大学学报》 CAS 北大核心 2016年第2期81-85,共5页 Journal of Naval University of Engineering
基金 国家部委基金资助项目(51327020105 51304010206)
关键词 不完全修复 METRIC 任务可用度 多阶段任务 incomplete repairability METRIC mission availability multi-stage task
分类号 E917 [军事]
  • 相关文献

参考文献6

二级参考文献74

  • 1张涛,郭波,谭跃进.k/N系统的多阶段任务可靠度模型[J].系统工程,2004,22(8):100-103. 被引量:8
  • 2郭波,张涛,张泉,谭跃进.备件组合方案下的多阶段任务成功性评估模型[J].系统工程理论与实践,2005,25(2):94-100. 被引量:20
  • 3Esary J D, Ziehms H. Reliability analysis of phased missions[C]// Proc. of the Conference of Reliabitity and Fault Tree Analy- sis, 1975:213 - 236.
  • 4Zang X. A BDD-based algorithm for reliability analysis of phased- mission systems[J]. IEEE Trans. on Reliability, 1999,48 (1) : 50 - 60.
  • 5Dugan J B. Automated analysis of phased-mission reliability[J]. IEEE Trans. on Reliability, 1991,40 (1):45 - 52.
  • 6Kim K, Kyng S P. Phased-mission system reliability under Markov environment[J], IEEE Trans. on Reliability,1994,43(2) :301- 309.
  • 7Bondavalli A, Chiaradonna S. Dependability modeling and evalu- ation of multiple-phased systems using DEEM[J]. IEEE Trans. on Reliability ,2004,53(4) :509 - 521.
  • 8Wnifrid G S. Mission success with components not as good as new[J]. Reliability Engineering and System Safety, 1996,52 (1) : 45 - 53.
  • 9Kim C. Analysis for mission reliability of a combat tank[J]. IEEE Trans. on Reliability, 1989, 38(2) :242 - 245.
  • 10Craw L H. A method for achieving an enhanced mission capacity[C]// Proc. of the Annual Reliability and Maintainability Symposi- um, 2002.

共引文献70

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部