摘要 冷热电三联供系统已成为建筑节能的重要途径和发展方向,本文以苏州某CBD区域建筑为例,基于相同类型建筑实测数据,获得建筑冷热电8760 h逐时负荷曲线,并基于此提出一种简单新方法(最大面积法)确定三联供系统最佳容量,分析了该CBD区域建筑导入三联供系统的可行性。结果表明:基于逐时热负荷曲线采取"最大面积法"确定的CBD建筑三联供方案有较好的一次能源利用效率(超过50%)和经济性(静态回收年限小于5年)。 Taken CBD buildings as examples, this paper analyzed their energy consumption characteristics based on the real-time data of similar CBD buildings and drew the Load Demand Duration Curves (LDDC). Then a new method, Maximum Rectangular Area (MR), was proposed to determine the capacity of CCHP and study the feasibility of CCHP for CBD buildings in Suzhou. Results show that CBD buildings are suited for CCHP in Suzhou if selected a reasonable equipment's size obtained by the method proposed, MRA, and gain a high Primary Energy Utilization Efficiency (PEUE) over 50% and a attractive benefit, whose Payback Period (PBP) is less than 5 years.
出处 《建筑热能通风空调》 2016年第4期5-8,共4页 Building Energy & Environment
基金 上海市科委科技攻关项目(09DZ1207704) "十二五"国家科技支撑计划(2012BAJ21B01-01) 国家教育部博士点基金资助项目(20110072120034)
关键词 冷热电三联供 逐时负荷曲线 最大面积法 Combined Cooling Heating and Power (CCHP), load demand duration curves, maximum rectangular area.
  • 相关文献

参考文献6

  • 1Yingdun Ruan, Qingrong Liu, Weiguo Zhou. Optimal option of distributed generation technologies for various commercial buildings[J]. Applied Energy, 2010, 86: 1641-1653.
  • 2杨木和.医院建筑应用冷热电三联供系统的优化配置研究[D].上海:同济大学.2010.
  • 3杨超.冷热电联产系统中负荷的模拟计算及系统优化方法研究[D].上海:同济大学,2013.
  • 4袁寅.建筑分布式能源系统经济性评价研究[D].上海:同济大学机械与能源工程学院,2013:35-38.
  • 5Hongbo Ren, Weijun Gao. A MILP model for integrated plan and evaluation of distributed energy systems[J]. Applied Energy, 2010, 87: 1001-1014.
  • 6Jiangjiang Wang, Zhiqiang Zhai, Youyin Jing. Particle swarm opti -mization for redundant building cooling heating and power system[J]. Applied Energy, 2010, 87: 3668-3679.

共引文献1

同被引文献40

引证文献2

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部