期刊文献+

某倒虹吸主体工程施工技术 被引量:3

Construction Technology of Main Works of Invert Siphon Project
下载PDF
导出
摘要 倒虹吸是输水工程中常用的建筑物,其施工技术备受关注。某倒虹吸由进口渐变段、进口检修闸、管身段、出口控制闸和出口渐变段组成,建筑物总长336,m。从土方开挖、土方回填、CFG桩施工及混凝土施工4个方面介绍了该倒虹吸管身段的施工技术,供类似工程参考。提出只有严格按照工艺要求进行施工才能保证施工的安全、质量和工期。 Inverted siphon is commonly used in water conveyance projects,therefore the construction technology of inverted siphon receives considerable attention.An inverted siphon was described,which consists of a transition section at inlet,inlet overhauling valve,pipe,outlet control valve and a transition section at outlet.The total length of the structure is 336,m.The construction technology of inverted siphon was introduced,which involves earthwork excavation,earthwork backfilling,CFG pile construction and concrete construction.It is hoped it can provide reference and guidance for similar projects.
作者 陈佳
出处 《天津科技》 2016年第5期77-79,83,共4页 Tianjin Science & Technology
关键词 倒虹吸 土方 CFG桩 混凝土 inverted siphon earthwork CFG pile concrete
  • 相关文献

参考文献3

二级参考文献6

共引文献189

同被引文献8

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部