摘要
结合国电宝鸡第二发电厂扩建工程的特点,确定了土钉与桩锚联合支护的基坑方案,阐述了翻车机室与输煤道基坑的施工工艺流程,基坑监测结果表明,该支护方案取得了良好的施工效果。
Combining with the features of the extension of the 2nd Power Plant in National Grid Baoji,the paper identifies the foundation pit scheme for the combined support of the nailing and pile anchor,illustrates the construction craft procedure of the wagon tipper house and coal transportation foundation pits,and proves by the foundation pit supervision that the support scheme achieves better construction effect.
出处
《山西建筑》
2016年第12期62-64,共3页
Shanxi Architecture
关键词
基坑
锚杆
土钉
支护
foundation pit
anchor
nailing
support