摘要
分析了一主变压器中性点因施工安装不合格导致主变中性点接地刀闸机构箱和高、低压侧保护测控装置烧毁的事故,并提出了一定的应对措施。
Analyzed the accident of main transformer neutral point main transformer neutral point grounding caused by unqualified construetion installation box and high voltage side and low voltage side breaker protection measurement device were burned, and put forward some countermeasures.
出处
《贵州电力技术》
2016年第4期24-25,共2页
Guizhou Electric Power Technology
关键词
接地
机构箱
变压器
烧毁
grounding
mechanism box
transformer
burnout