期刊文献+

织金区块浅层煤层气J形大位移水平井钻井技术 被引量:10

Drilling Techniques in J-Shaped Extended Reach Horizontal Wells in Shallow Coal Bed Methane Reservoirs in the Zhijin Block
下载PDF
导出
摘要 织金煤层气区块存在煤层钻遇率低、储层保护难度大、水平连通井钻井成本高、经济收益低等问题,为此,在分析该区块J形水平井工程技术难点的基础上,从井眼轨道优化设计、井身结构优化设计、井眼轨迹控制技术等方面进行了浅层煤层气J形大位移水平井钻井技术研究,并在织平1井进行了试验。织平1井顺利完钻,水平段长500.00m,水平位移818.98m,最大井斜角97.6°,钻遇煤层293.00m,煤层钻遇率58.6%,远高于水平连通井的煤层钻遇率(43.6%),且钻井成本为U形水平连通井的58%。这表明,采用J形水平井钻井技术可以解决织金煤层气区块存在的问题,可以在织金区块推广应用。 The drilling phase for in the Zhijin coalbed methane(CBM)block is characterized by a low drilling rate for the coal seam,a difficult-to-protect reservoir,high cost of drilling horizontal connected wells,and a low economic benefit.In order to solve these problems,the technical difficulties of J-shaped horizontal drilling were applied to this block and analyzed.Then,drilling techniques in such wells drilling in shallow CMB reservoirs were studied from well track optimization,casing program optimization and borehole trajectory control.Finally,the process underwent a practical test in the Zhiping 1 Well.This well was drilled smoothly with horizontal lateral of 500.00 m,horizontal displacement 818.98 m,maximum deviation angle 97.6°,drilled coal seams 293.00 mand coal seam drilling rate 58.6%,which is much higher than that of horizontal connected wells(43.6%).In addition,the cost to drill the well was only58% of that of U-shaped horizontal connected wells.The positive results indicated that these drilling techniques in J-shaped horizontal well could be successfully implemented in drilling wells in the Zhijin Block.
作者 李红伟 张斌
出处 《石油钻探技术》 CAS CSCD 北大核心 2016年第2期46-50,共5页 Petroleum Drilling Techniques
关键词 煤层气 大位移井 水平井 井身结构 井眼轨迹 织金区块 织平1井 coalbed methane extended reach well horizontal well casing program borehole trajectory Zhijin Block Well Zhiping 1
  • 相关文献

参考文献10

二级参考文献60

共引文献256

同被引文献72

引证文献10

二级引证文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部