摘要
钢结构工程日益成为高层尤其是超高层建筑结构施工最重要的专业工程之一,其进度亦成为制约项目整体计划的关键因素.对宝钢总部基地1号楼钢结构工程施工过程进行分析,从钢结构详图、工厂制作、现场吊装方案等方面,介绍了施工各阶段影响钢结构工程进度的主要因素,提出了具体可行的钢结构施工方案及组织措施,确保钢结构进度计划得以实现.
Steel structure engineering has become one of the most important in high-rise building, and the schedule becomes the key factor of restricting the overall progress of the project. The steel structure engineering construction of No. 1 building of Baosteel Headquarters Base were analyzed from the detail design, production and installation, the main factors of affecting steel structure schedule were described, e feasible scheme and organization measurements were proposed, which ensure the steel structure of e progress come true.
出处
《上海工程技术大学学报》
CAS
2016年第1期22-25,32,共5页
Journal of Shanghai University of Engineering Science
关键词
钢结构
进度计划
施工工序
steel structure
progress plan
construction procedure