摘要
预应力结构施工建设中,有时会出现预应力钢绞线切断失去继续张拉条件后,发现锚下有效预应力不足的情况,采取何种方案进行补张拉值得研究。结合工程实例,通过建立计算模型对完整锚板和含连接面锚板进行受力性能分析,通过对比分析得出:所采取的后续补张拉处置方法是可行的,并给出中横梁区域的补强设计,可为其他工程同类问题提供借鉴。
Combining with the engineering example,though the establishment of calculation model of complete and contained junction surface of anchor plate to analysis behavior,through contrastive analysis draw conclusions: the method is feasible,provide the reinforcement design of middle transverse beam area,which would be a practical and useful reference for engineers in similar projects.
出处
《公路工程》
北大核心
2016年第2期144-147,共4页
Highway Engineering
关键词
中横梁
补张拉
数值模拟
处置方法
middle transverse beam
subsequenttensioning
numericalsimulation
disposal method