高墩连续刚构桥0号块托架预应力预压方案可行性研究 被引量:14

Feasibility Analysis of Bracket Structure Preloading for No.0 Piece of Continuous Rigid-Framed Bridge with High-Piers
下载PDF
导出
摘要 当墩身较高时,大跨度连续刚构桥0号块一般采用托架施工,但因0号块荷载较大,托架预压成为施工时的一项重要工作。基于现场试验数据,并通过有限元分析,对湖南省默戎高架桥主桥0#块托架的预应力预压方案进行可行性研究。研究表明,预应力预压方案切实可行,可供类似工程借鉴。 The construction technology of bracket is applied to pier table construction of a Superlong Frame-Continuous bridge while the measure of pier shaft is high. Preloading technology of bracket is an important procedure of construction owing to larger load at pier table. Finite element analysis is used to study the prestress preloading technology of pier table bracket for Morong viaduct in Hunan province based on field data. Result shows that the prestress preloading technology is feasible and it also can provide references for other projects.
作者 李彪 郭攀
出处 《公路工程》 北大核心 2016年第2期260-264,共5页 Highway Engineering
关键词 连续刚构桥 高墩 托架预压 预应力 有限元 continuous rigid-framed bridge high-piers bracket structure preloading prestress technology finite element analysis
  • 相关文献

参考文献24

二级参考文献73

共引文献178

同被引文献63

引证文献14

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部