5Szpigel B.Optimal train scheduling on a single track railway.Operations Research' 72,1973:343-352.
6Song Jingfen,Bao Fanbiao,Cai Yun.Research on location evaluation of logistics center in total logistics hinge cities.Journal of Wuhan University of Technology,2004; 26(4):165-168,173.
7Cai X,Goh C J.A fast heuristic for the train scheduling problem.Computers and Operations Research,1994; 21(5):499-510.
8Newton H N,Barnhart C,Vance P H.Constructing railroad blocking plans to minimize handling costs.Transportation Science,1998;32(4):330-338.
9Caprara A,Fischetti M,Toth P.Modeling and solving the train timetabling problem.Operations Research,2002;50(5):851-861.
10Szpigel B. Optimal train scheduling on a single line railway[M]. Operational Research, 1973,7:344-351.