The first limited recourse of financing power project without government's guarantee in China runs well
-
1Automation of Thermal Power Plant[J].Electricity,1999(3):51-51.
-
2张源斌,张文元,邹林,马春排.DLE———Ⅱ数字式电力系统过电压在线监测仪[J].高电压技术,1996,22(2):36-37. 被引量:9
-
3World first intertidal offshore wind power project started[J].Electricity,2011,22(3):54-54.
-
4Wang Xiliang(China Electric Power Information Center).The Three Gorges Power Project Will PromotePower Network Interconnections throughout China[J].Electricity,1998(3):6-8.
-
5Xu Jintao.Some facts and figures about the electric power industry in 1991[J].Electricity,1992(2):2-3.
-
6Improvement in Mechanical Design of Chinese Thermal Power Plant[J].Electricity,1999(1):18-21.
-
7The first 1000 MW class thermal power plant emerged in Jiangxi Province[J].Electricity,2000(3):30-30.
-
8我国首条特高压输电线路实现经济社会效益双赢[J].内蒙古电力技术,2011,29(3):29-29.
-
9翟海军,王先友,杨红平,李晶明.掺杂α-Ni(OH)_2的电极性能研究[J].电源技术,2003,27(B05):197-200. 被引量:6
-
10Electric Power Production Monthly Report (April 2006)[J].Electricity,2006,17(2):51-51.