Three Gorges-Guangdong and Guizhou-Guangdong ±500 kV DC transmission projects The contracts of the procurementon the converter station equipment signed
-
1Three Gorges-Guangdong 500 kV transmission project started to construct[J].Electricity,2002(1):54-54.
-
2Ding Chengchan.EDGE ON CRUISE WITH THETHREE GORGES[J].重庆与世界(Hello重庆),2013(14).
-
3TWO POWER PLANT CONTRACTS SIGNED[J].Electricity,1991(1):57-57.
-
4Contracts for importing 1st phase project equipment of Yangcheng Power Plant signed Building power plant at coal pit-head, sending power to load center province[J].Electricity,1996(4):49-49.
-
5Zhou Xianlin Lin Tingwei.Look Back Transmission Planning Around Three Gorges[J].Electricity,2011,22(2):24-29.
-
6Three Gorges Resettlement Facing Challenge[J].Electricity,1997(3):4-4.
-
7CGNPC signs memorandum of understanding with Australian uranium producer Paladin[J].Electricity,2010,21(4):32-32.
-
8Cascade 1 Hydropower Station Implemented on Woka River in Tibet of China[J].Small Hydro Power News,2002,19(69):23-23.
-
9A Contract for Largest Wind Farm Signed in China[J].Electricity,2006,17(1):20-20.
-
10The franchise contract on the first power plant to be BOT-built signed[J].Electricity,1996(4):48-48.