Xuanwei Power Plant 5th Phase Project was completely built up
-
1TianshengqiaoⅠcascade and Ⅱ cascade hydropower stations completely built up[J].Electricity,2001(1):50-50.
-
2凌特新型升压转换器适合锂离子及多元碱性/镍氢电池应用[J].电源技术应用,2004,7(12).
-
3凌特新型升压转换器适用于锂离子及碱性/镍氢电池[J].现代电子技术,2004,27(22):115-115.
-
4500-kV compact type over-head line to be constructed in Yunnan[J].Electricity,2007,18(3):7-7.
-
5吴金龙.IEC网站近期发布的标准No.7/2004-3[J].电器工业,2004(6):52-52.
-
6Antonio Carlos Padoan Jr.,Christophe Nicolet,Basile Kawkabani,Jean-Jacques Simond,Alexander Schwery,Francois Avellan.Stability Study of a Mixed Islanded Power Network[J].Journal of Energy and Power Engineering,2014,8(8):1449-1459.
-
7刘健.No.7配电网的协调控制需尽量简单化[J].供用电,2016,33(7):28-31. 被引量:1
-
8The first domesticated large-sized nuclear power plant was built up[J].Electricity,2001(4):52-52.
-
9Power Control and Automation in NorthwestPower Network[J].Electricity,1997(1):5-6.
-
10Electric Power Production Monthly Report(October,2006)[J].Electricity,2006,17(4):50-50.