The Second Circuit Transmission Project for Fujian-East China interconnection started
-
1Interconnection Project of Fujian Power Grid With East China Power Network Formally Started to Construct[J].Electricity,2000(2):55-55.
-
2Fujian and East China power networks interconnected[J].Electricity,2001(4):50-50.
-
3Dispatched load of East China grid exceeded 168 GW[J].Electricity,2011,22(3):51-51.
-
4Three Gorges-Guangdong 500 kV transmission project started to construct[J].Electricity,2002(1):54-54.
-
5Exploiting Southwestern Energy Resources,Promoting Interprovincial Interconnection─Power Supply from West to East Program[J].Electricity,1998(1):9-10.
-
6Jinping Ⅱ hydropower station started construction formally[J].Electricity,2007,18(1):4-4.
-
7Fujian Putian Power Rich Import .& Export Co.,Ltd[J].China International Business,2013(7):2-2.
-
8SG’s UHVDC experiment and demonstration project started[J].Electricity,2006,17(3):1-1.
-
9Pilot UHVAC transmission project started[J].Electricity,2007,18(2):5-5.
-
10Xiangfan Coal-fired Power Plant - a matched large power plant for Three Gorges Project starts to construct[J].Electricity,1996(4):44-44.