摘要
本文介绍了石佛寺水库的工程情况及人工湿地的重要性。通过对生态水面景观效果、不同生态蓄水位预泄时长和不同生态蓄水位坝后浸没影响等方面的对比分析,确定了最为科学合理的蓄水水位和调度方式。
In the paper,engineering condition and artificial wetland importance of Shifosi Reservoir are introduced. The most scientific and rational accumulated water level and scheduling mode are determined through comparative analysis in the aspects of ecological water surface landscape effect,different ecological accumulated water level pre-discharge durations,immersion influence of different ecological accumulated water level behind dam,etc. The most scientific and rational accumulated water level and scheduling mode are determined.
出处
《水利建设与管理》
2016年第4期42-45,8,共5页
Water Conservancy Construction and Management
关键词
石佛寺水库
人工湿地
生态水位
Shifosi Reservoir
artificial wetland
ecological water level