摘要 某工程为典型的大型低坝长隧洞引水式水电站,其3号引水隧洞沿线工程地质条件十分复杂,各洞段所受主要外荷载为外水压力,施工期分洞段埋设监测仪器,至今已观测15年时间。观测成果表明隧洞沿线外水压力总体小于设计推测值,仅出口洞段外水压力略大于设计推测值,需加强监测和放空检查。 The project is a diversion type hydropower station with a typical large low dam and long tunnel, whose No.3 diversion tunnel has complex engineering geological conditions. The main external loads of each tunnel section are external water pressure. Monitoring instruments are constructed at each tunnel section during the construction period, which have been monitored for about 15 years. The monitoring results show that the external water pressure of the tunnel is smaller than the design value generally, except for that of outlet tunnel section is bigger than the design value, which shall be emptied for inspection.
出处 《红水河》 2016年第2期41-45,共5页 Hongshui River
关键词 引水隧洞 外水压力 监测 水电站 diversion tunnel external water pressure monitoring hydropower station
  • 相关文献

参考文献5

二级参考文献14

共引文献96

同被引文献19

引证文献2

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部