摘要
通过对扎哈淖尔露天矿半连续工艺2种移设方案对比研究,将半连续排土系统与单斗-卡车工艺作业区域进行合理化分配,增加了有效内排空间,降低了生产成本,提高了经济效益。
Through comparatively researching two kinds of shift schemes of semi-continuous system in Zhahanao'er Open-pit Mine,the mine rationally distributes semi-continuous dumping system and single bucket truck operation area, which increases effective internal dumping space, reduces production cost and improves economic benefit.
出处
《露天采矿技术》
CAS
2016年第4期1-3,7,共4页
Opencast Mining Technology
关键词
露天矿
输岩系统
胶带移设
靠帮
Zhahanao'er Open-pit Mine
rock transportation system
belt shift
near slope