摘要
Y2002-63059-97 0211695应用任务配置技术的预空实时任务满足定时约束=Satisfying timing constraints of preemptive real-time tasksthrough task Layout technique〔会,英〕/Datta,A.&Choudhury,S.//2001 IEEE the 14th International Con-ference on VLSI Design.-97~102(E)
出处
《电子科技文摘》
2002年第6期122-123,共2页
Sci.& Tech.Abstract