期刊文献+

基于物联网技术的生产物料管理系统设计与仿真 被引量:1

Design and Simulation of Production Material Management System based on the Internet of Things
下载PDF
导出
摘要 文中应用了RFID数据采集技术和e M-Plant仿真技术对智慧工厂的物料管理系统进行优化设计。首先应用了RFID读写器实时对物料信息的动态采集,最后利用e M-Plant仿真软件对车间内的对物料系统进行瓶颈优化分析,以实现车间物流实时控制与可视化管理。 In this paper,the RFID and e M- Plant simulation is applied in wisdom plant material management system to optimize. First,apply the RFID to get real- time dynamic acquisition of material information. Finally,e M- Plant simulation software for the material system bottleneck optimization analysis workshop,in order to achieve real- time control and visualization of logistics management.
作者 安琪
出处 《物流工程与管理》 2016年第3期120-121,共2页 Logistics Engineering and Management
关键词 智能工厂 RFID e M-Plant仿真技术 物料管理系统 wisdom plant RFID e M-Plant simulation technology production material management
  • 相关文献

参考文献2

二级参考文献9

  • 1Yan Hongsen. Hierarchical stochastic production planning with delay interaction [J]. J of Optimization Theory and Applications, 2000,104(3):659-689.
  • 2Lasserre J B. An integrated model for job-shop planning and scheduling[J]. Management Science, 1992, 38(8):1201-1211.
  • 3Anwar M F,Nagi R. Integrated lotsizing and scheduling for just-in-time production of complex assemblies with finite set-up[J].Int J of Production Research,1997,35(5):1447-1470.
  • 4Haase K, Kimms A. Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities [J ]. Int J Production Economics, 2000, 66(2): 159-169.
  • 5Kimms A. A genetic algorithm for multi-level, multimachine lot sizing and scheduling [J]. Computers & Operations Research, 1999, 26(8): 829-848.
  • 6Knosala R, Wal T. A production scheduling problem using genetic algorithm[J]. J of Materials Processing Technology, 2001, 109(1-2): 90-95.
  • 7Cheng Runwei, Gen Mitsuo, Tsujimura Yasuhiro. A tutorial survey of job-shop scheduling problems using genetic algorithms--Part II: Hybrid genetic search strategies [J]. Computers & Industrial Engineering,1999. 36(2):343-364.
  • 8Li Y, Ip W H, Wang D W. Genetic algorithm approach to earliness and tardiness production scheduling and planning problem [J]. Int. J Production Economics,1998, 54(1): 65-76.
  • 9严洪森,张晓东.最优递阶随机生产计划与控制[J].自动化学报,2002,28(1):83-89. 被引量:4

共引文献42

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部