摘要
本文全面阐述了闹德海水库不同时期的改造和加固方案,并进行了对比分析,其中大坝安全度、供水保证率均有保障和提高,为现有水库改造、加固方案的制定提供了参考。
In the paper, reconstruction and reinforcement plans of Naodehai Reservoir at different stages are comprehensively described,and comparatively analyzed,wherein dam safety and water supply reliability are guaranteed and improved,thereby providing reference for formulating existing reservoir reconstruction and reinforcement plan.
出处
《水利建设与管理》
2016年第2期61-67,共7页
Water Conservancy Construction and Management
关键词
改造加固
方案对比分析
不同运用方式
闹德海水库
reconstruction and reinforcement
plan comparative analysis
different operation modes
Naodehai Reservoir