区间城市隧道人工填土段矿山法施工风险极高。文章以某城市隧道为例,对施工方案和沉降报警进行了探讨,解决了工程中的而具体难题,研究成果可为类似工程提供技术参考。
The construction risk of the mining method of the artificial fill section of the urban tunnel is extremely high.Taking a city tunnel as an example,this paper discussed the construction scheme and the settlement alarm,and solved the problems in the engineering, and the research results can provide technical reference for similar projects.
出处
《企业技术开发》
2016年第4期7-9,共3页
Technological Development of Enterprise
关键词
区间隧道
矿山法
填土段
施工方案
报警
interval tunnel
mining method
fill section
construction scheme
alarm