3Antonio Sarcos-Portillo, Alfredo Navarro-Cerpa, Hildrun Garcia-Legl. Inspection and Process of Tension of Cables of General Rafael Urdaneta Bridge[J]. Journal of Bridge Engineering, 2003,Vol. 8(4): p223-228.
4Frank L.Stahl, Christopher P. Gagnon. Cable Corrosion in Bridges and Other Structures[M]. ASCE Press, 1996.
5徐俊.拉索损伤演化模型及剩余使用寿命评估[D].上海:同济大学,2003.
6R. M. Mayrbaurl, S.Camo. Cracking and Fracture of Suspension Bridge Wire[J]. Journal of Bridge Engineering, 2001,(6):p645-650.
7Ian D. Peggs, Bruce Schmucke, Peter Carey. Assessment of Maximum Allowable Strains in Polyethylene and Polyprupylene Geomembranes [J]. Proceedings of the Sessions of the Geo-Frontiers 2005 Congress : p418-424.
8Hopwood T.,Haven J. Inspection, Prevention, and Remedy of Suspension Bridge Cable Corrosion Problems[R]. Kentucky:Kentucky Transportation Reseaxch Program Report UKTRP-84-15, May,1984.
9R. M. Salas, A. L. Kotys, J. S. West, et al. Final Evaluation of Corrosion Protection for Bonded Internal Tendons in Precast Segmental Construction [R]. Research Report 1405-6, Texas: Texas Department of Transportation, 2002.
10J.Toribio, E. OVEJERO. Failure analysis of cold drawn prestressing steel wires subjected to stress corrosion cracking[J]. Engineering Failure Analysis, 2005,(12) : p654-661.