摘要
调研了西山煤电春晖佳园项目现浇空心楼板的质量缺陷,分析了影响空心楼板一次成型合格率的各种因素,制定了质量控制对策,并通过QC实验,验证了其合理性和可行性,最终达到了提高施工质量的目标。
The paper investigates the quality defects of the cast-in-place hollow floor in Chunhui Jiayuan Project of Xishan Coal and Electricity Power,analyzes various factors affecting the one-time qualified rate of hollow floors,makes the quality controlling strategies,and proves it to be reasonable and feasible according to QC experiment,so as to improve the construction quality.
出处
《山西建筑》
2016年第13期213-214,共2页
Shanxi Architecture
关键词
现浇空心楼板
箱模
质量缺陷
QC
cast-in-place hollow floor
box mold
quality defect
QC