5CHANG S B, MOON S J. A case study on instrumentations of a large tunnel crossing under the existing subway structure[C]//Proceedings of the KGS 2000 Spring Conference.[S. l.]: [s. n.], 2000:56--59
6SHARMA J S, HEFNY A M, ZHAO J, et al. Effect of large excavation on deformation of adjacent MRT tunnels[J]. Tunnelling and Underground Space Technology, 2001, 16(1): 93--98
7BRENNER B, NEFF T. Design and management for underground uncertainty on the central artery/tunnel project[C]// North American Tunnelling'00. [S. l.]: [s. n.], 2000: 13--21.
8SCHWEIGER H F, KUMMERER C. Numerical modeling of settlement compensation by means of fracture grouting[J]. Soils and Foundations, 2004, 44(1): 71--86.
9GRYNKEWICZ F, ROBERT B. Instrumentation controls for chemical grouting during tunneling operation[C]// North American Tunnelnng'00.[S.l.]: [s. n.], 2000:465 --474.