期刊文献+

低渗透油藏合理关井测压时间的确定 被引量:15

DETERMINATION OF THE REASONABLE SHUT-IN PRESSURE MEASURING TIMES IN THE LOW-PERMERBILITY OIL RESERVOIR
下载PDF
导出
摘要 为了提高试井解释参数的可靠性,减少因关井导致的产量损失,开展了低渗透油藏合理关井测压时间研究。依据压力恢复曲线,考虑井筒储集效应及表皮效应的影响给出常规关井时间的确定方法;考虑边界或供油半径对关井时间的影响,通过半对数曲线回归得到探测半径与关井时间的数学表达式。特低渗透油藏测试的合理关井时间确定方法:选取常规方法计算的合理关井时间及受邻井干扰时间两项中的最小值。利用该方法确定的合理关井测压时间可以有效指导试井方案实施,加深对低渗透油层动态特征认识。 In order to improve the reliability of well test interpretation and reduce the production lose due to the well shut-in,the researches on the reasonable pressure measuring time are conducted for the low-permeability oil reservoir.By means of the pressure buildup curve and considering the influences of the borehole storage and skin effects,the determing methods for conventional shut-in time are presented;in the consideration of the effects of the boundaries and oil drainage radius on the time,and moreover with the help of the semi-log plot regression,the mathematical expression between the investigation radius and shut-in time is obtained.The determining method of reasonable shut-in testing time in extra-low-permeability oil reservoirs shows as follows:to he is selecting the minimum value between the reasonable shut-in time from the conventional calculating methods and interferred time by the offset wells.The reasonable shut-in testing time by this method can provide the guide for the effective implementation of well test program and deepen the cognition of the performance characteristics of the low-permeability reservoir.
出处 《大庆石油地质与开发》 CAS CSCD 北大核心 2016年第3期69-72,共4页 Petroleum Geology & Oilfield Development in Daqing
基金 国家自然科学基金重点项目"低渗透油层提高驱油效率的机理研究"(50634020)
关键词 关井时间 压力恢复曲线 泄油半径 试井 shut-in time pressure buildup curve drainage radius well test
  • 相关文献

参考文献6

  • 1Harald Stehfest.Algorithm 368: Numerical inversion of Laplace transforms [D5][J]. Communications of the ACM . 1970 (1)
  • 2LIU C L,ZHANG S H,DOU S P,et al.Productivity Analysis of Fractured Wells in Low-permeability Naturally Fractured Reservoirs. Asia-Pacific Power and Energy Engineering Conference 2010 . 2010
  • 3O1arewaju,J.S,Lee,W.J.An Analytical Model for Composite Reservoir Produced at Either Constant Bottomhole Pressure or Constant Rate. SPE 16763 . 1987
  • 4Juris Vairogs,C.L Hearn.Effect of Rock Stress on Gas Production From Low-Permeability Reservoirs. SPE3001 . 1971
  • 5DAtta-Gupta A,Vasco D W,Long J C S.Sensitivity and Spatial Resolution of Transien Pressure and Trace Data for Heterogeneity Characterization. SPE30589 . 1995
  • 6YIN Hongjun,ZHANG Shaohui.Pressure Transient Analysis of Vertically Fractured Multi-well System. Asia-Pacific Power and Energy Engineering Conference(APPEEC2010) . 2010

同被引文献78

引证文献15

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部