针对产品开发过程中存在的资源分配不合理问题,研究现有带约束的耦合集求解模型,并以产品设计开发所需要的时间总量为优化目标,建立具有资源最优化配置特性的耦合集求解模型,通过求解该模型得到各个任务小组的资源最优化配置情况,解决了原资源分配不合理问题。将该模型运用于某空气净化器的开发过程中,对其开发过程中存在的资源分配不合理问题进行优化,以减少开发过程所需的时间,并验证了该模型的有效性。
Aiming at the unreasonable resource allocation problem that existed in the product development process, the current coupled set solving model with constraints was studied. And the coupled set solving model with resource optimization configuration properties was established. The required time for product design and development was set as the optimization goal.The original unreasonable resource allocation problem was solved by solving the model to obtain the resource optimization allocation of each task. The model was applied to the development process of an air purifier. The unreasonable resource allocation problem in the development process was optimized, therefore, the required development time was reduced, and the validity of the model was verified.
出处
《机械设计》
CSCD
北大核心
2016年第4期67-71,共5页
Journal of Machine Design
基金
国家自然科学基金资助项目(51475265)
三峡大学硕士学位论文培优基金资助项目(2015PY029)
关键词
资源最优化配置
资源约束
工作转移矩阵
耦合集
空气净化器
resource optimization configuration
resource constraints
work transformation matrix
coupled set
air purifier