摘要
基于青浦供电公司原冷热源系统运行中存在的问题,考虑当前新增的冷负荷的需求,在不改变末端管道的前提下,对冷热源系统进行改造。本文具体分析了冷热源系统的改造思路、设备配置以及运行状况,阐述了相应设备、管道及运行策略的改造状况。从而保证改造后的系统能够适应新的负荷要求,并能够充分利用冰蓄冷+电蓄热的优势,保证系统的节能性和可靠性。
Based on the problems of the cold and heat sour ce in the operation of the Qingpu electric company,considering the demand of the new cooling load,the cold and heat source system is reformed in the premise of existing pipe.In this paper,the reform ideas,equipment configuration and the operating conditions of the system will be analyzed in detail.The reformed system can adapt to the new load requirements,and the advantages of ice storage system and electric storage system will be made full use to ensure energy saving and reliability of the system.
关键词
冰蓄冷
电蓄热
系统改造
ice storage system
electric storage system
reform