期刊文献+

岩土锚固工程安全性能影响因素分析 被引量:1

Analysis the main points of the rock and earth anchoring construction safety
下载PDF
导出
摘要 岩土锚固工程在边坡、隧道、深基坑、结构抗浮或抗斜以及硐室结构中保证工程的稳定性问题越来越受到关注,本文对锚杆的安全系数、试验及验收技术以及不合格锚杆的处理方法三个直接影响其安全性的要点展开分析,为提升我国岩土锚固工程的安全系数,促进岩土工程整体质量的提升。 Rock and earth anchoring construction in the slope, tunnel, deep foundation pit, or anti inclined structure anti-uplift and cavern structure to ensure the stability of the engineering problem is more and more attention, in this paper, the anchor of safety coefficient, test and acceptance of the technology and methods of dealing with the unqualified anchor analyzes three main points of the directly affects the safety, to improve the safety factor of rock and earth anchoring construction in our country, promote the overall quality of nontechnical engineering.
作者 赵瑞
出处 《湖南城市学院学报(自然科学版)》 CAS 2016年第1期52-53,共2页 Journal of Hunan City University:Natural Science
关键词 岩土 锚固工程 安全性 Geo technical The anchoring engineering security
  • 相关文献

参考文献2

二级参考文献21

  • 1韩军,张智浩,艾凯.影响岩土锚固工程安全性的几个关键问题[J].岩石力学与工程学报,2006,25(z2):3874-3878. 被引量:12
  • 2程良奎.岩土锚固研究与新进展[J].岩石力学与工程学报,2005,24(21):3803-3811. 被引量:146
  • 3PARRY-DAVIES R,KNOTTENBELT E C.Investigations into long-term performance of anchors in South Africa with emphasis on aspects requiring care[C]// Proceedings of International Symposium on Ground Anchorages and Anchored Structures.London:Themas Telford,1997:384-392.
  • 4JONES D,TONGE D,SIMPSON A.Design,installation,testing and long-term monitoring of 200 t rock anchorages at Sandon Dock,Liverpool[C]// Proceedings of International Symposium on Ground Anchorages and Anchored Structures.London:Themas Telford,1997:297-307.
  • 5WEERASINGHE R B,ANSON R W W.Investigation on long-term performance and future behaviour of existing ground anchorages[C]// Proceedings of International Symposium on Ground Anchorages and Anchored Structures.London:Themas Telford,1997:353-362.
  • 6FEDDERSEN I.Improvement of the overall stability of a gravity dam with 4 500 kN anchors[C]// Proceedings of International Symposium on Ground Anchorages and Anchored Structures.London:Themas Telford,1997:318-325.
  • 7BARLEY A D.The failure of a 21-year old anchored sheet pile quay wall on the Thames[J].Ground Engineering,1997,30(2):42-45.
  • 8LITTLEJOHN G S.地锚的腐蚀特性[C]// 岩土预应力锚固技术应用及研究.长沙:湖南科学技术出版社,2002:160-181.
  • 9中华人民共和国行业标准编写组.CECS22:2005岩土锚杆(索)技术规程[S].北京:计划出版社,2005.
  • 10FISCHLI F.Electrically isolated anchorages[C]// Proceedings of International Symposium on Ground Anchorages and Anchored Structures.London:Themas Telford,1997:335-342.

共引文献128

同被引文献5

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部