长沙中低速磁浮工程建设中的重要举措 被引量:16

Key Technologies in the Construction of Medium and Lowspeed Maglev in Changsha City
下载PDF
导出
摘要 以我国首条中低速磁浮商业运营线——长沙中低速磁浮工程为实践案例,阐述了中低速磁浮系统的构成和技术经济特征,介绍了工程设计、施工、调试的标准和经验,包括电磁兼容问题、轨排技术方案、轨道梁设计、系统联调等方面在建设过程中的重要举措。展望了中低速磁浮技术在我国的应用前景。 The first and the world longest urban maglev commercial demonstration line of China has been constructed in Changsha City. Based on this line, the technical and economic characteristics and the configuration of Changsha medium and low-speed maglev system arc descrihed, the experiences in establishing the designing codes, construction regulations and criteria for acceptance are introduced. The key technologies in the construction, such as electro-magnetic compatibility, track skeleton, guideway-beam design, integration test and commissioning are discussed. At last, the further application of urban maglev system in China is prospected.
出处 《城市轨道交通研究》 北大核心 2016年第5期1-4,14,共5页 Urban Mass Transit
关键词 中低速磁浮工程 磁浮列车 工程化应用 medium and low-speed maglev maglev train engineering application
  • 相关文献

参考文献5

  • 1中国国家标准化管理委员会.航空无线电导航台(站)电磁环境要求:GB6364-2013[S].北京:中国标准出版社,2014.
  • 2中国民用航空局.航空无线电导航台和空中交通管制雷达站设置场地规范:MH/T4003.1-2014[S].北京:中国民航出版社,2014.
  • 3湖南磁浮交通发展股份有限公司.长沙磁浮交通工程设计暂行规定:Q/HNCFGS002-2015[S].
  • 4湖南磁浮交通发展股份有限公司.长沙磁浮交通工程施工及验收暂行规定:Q/HNCFGS001-2015[S].
  • 5丁信华.对磁浮工程技术的一些思考[J].城市轨道交通研究,2015,18(5):10-13. 被引量:8

共引文献7

同被引文献110

引证文献16

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部